LA Sanitation (LASAN) stands at the forefront of innovation and technology, continually developing new and cutting-edge special projects to protect the public health and environment in the City of Los Angeles.

From adopting state-of-the-art renewable energy projects at LASAN water reclamation plants to using smart technology to ensure all Los Angeles streets are Clean Streets, LASAN is committed to identifying, developing and using new and emerging technologies in order to make Los Angeles a more sustainable and livable City.

If you have any questions about our projects or services, please call our 24-hour Customer Care Center at 1-800-773-2489.

Avenue 34 SP Image 425 by 260
LA Sanitation & Environment is the lead City department to develop and implement an offsite sampling and testing plan for the Avenue 34 Redevelopment Project.More about AVENUE 34
lawins 425x260

The LAWINS control room centralizes system monitoring which increases safety, reliability efficiency, and sustainability of all the City’s wastewater and water reclamation operations.

More about LOS ANGELES WASTEWATER INTEGRATED NETWORK SYSTEMS (LAWINS)
Machado LaKE BOX PHOTO
The primary goal of the project is to improve the water quality in Machado Lake, while enhancing the surrounding natural habitat and the recreational features of the park.More about MACHADO ECOSYSTEM LAKE REHABILITATION PROJECT
DGUP 425x260

The DGUP at Hyperion Water Reclamation Plant is a combined cycle cogeneration facility, also known as a renewable energy facility. Two Solar Mars 100 Combustion Turbine and Generation Packages will be installed, fulfilling the energy needs of the plant.

More about DIGESTER GAS UTILIZATION PROJECT (DGUP)
TIRE 425x260

The Terminal Island Renewable Energy Project (TIRE) places biosolids in depleted deep subsurface oil and gas formations to generate methane gas that can ultimately be used to produce an environmentally safe renewable energy.

More about TERMINAL ISLAND RENEWABLE ENERGY (TIRE)

Venice

The new force main will operate as a parallel system in conjunction with the existing 48-inch force main to meet the peak wet weather flow demands experienced at the Venice Pumping Plant and to add operational flexibility and reliability.

More about VENICE DUAL FORCE MAIN