Projects

Echo Park Lake hero

Proposition O funds projects that fall into one or more of the following categories:  

  • Water-quality protection of rivers, lakes, beaches, bays and the ocean
  • Water conservation, drinking water and source protection
  • Flood water reduction, river and neighborhood parks that prevent polluted runoff and improve water quality
  • Stormwater capture, cleanup and re-use

An Administrative Oversight Committee (AOC) and Citizens Oversight Advisory Committee (COAC) administer the projects funded by Proposition O.

 
PROJECT TITLE


PROJECTS IN PRE-DESIGN
Land Acquisition / Right of Way Projects

  • Aliso Creek-Limekiln Creek Restoration
  • Machado Lake Ecosystem Rehabilitation HRMMP
PROJECTS IN DESIGN
  • Rory M. Shaw Wetlands Park*
PROJECTS IN BID & AWARD
  • Vermont Ave. Stormwater Capture & Green St. Ph II
PROJECTS IN CONSTRUCTION
  • Argo Drain Sub-basin Facility
  • Catch Basin Inserts & Opening Screen Covers Phase IV*
  • Machado Lake Pipeline – Eastern Reach**
  • Westwood Neighborhood Greenway
PROJECTS IN POST CONSTRUCTION
  • Albion Riverside Park
  • Machado Lake Ecosystem Rehabilitation
  • Machado Lake Pipeline**
  • Mar Vista Recreation Center Stormwater BMP Phase II
  • Penmar Water Quality Improvement Phase II
  • Temescal Canyon Park Stormwater BMP Phase II
  • Vermont Ave. Stormwater Capture & Green St. Phase 1
PROJECTS COMPLETED
  • Albion Dairy Park – Demolition & Remediation
  • Albion Dairy Park – Land Acquisition*
  • Avalon Green Alley South
  • Broadway Neighborhood Stormwater Greenway
  • Catch Basin Inserts and Coverings Phase I
  • Catch Basin Opening Screen Covers Phase II
  • Catch Basin Inserts & Opening Screen Covers Phase III*
  • Cesar Chavez Ground Water Improvement* (a.k.a. Sheldon Arleta)
  • Echo Park Lake Rehabilitation
  • Elmer Avenue Phase II: Elmer Paseo
  • Glenoaks/Sunland Stormwater Capture
  • Grand Blvd. Tree Wells
  • Hansen Dam Wetlands Restoration
  • Imperial Highway Sunken Median Stormwater BMP
  • Inner Cabrillo Beach Bacterial Water Quality Improvement*
  • Los Angeles Zoo Parking Lot
  • Machado Lake Phase I (Wilmington Drain)
  • Mar Vista Recreation Center Stormwater BMP
  • Oros Green Street
  • Peck Park Canyon Enhancement
  • Penmar Water Quality Improvement Phase I
  • Rosecrans Recreation Center Stormwater Enhancements*
  • Santa Monica Bay Low Flow Diversion Upgrades Pkg. 1
  • Santa Monica Bay Low Flow Diversion Upgrades Pkg. 2
  • Santa Monica Bay Low Flow Diversion Upgrades Pkg. 3
  • Santa Monica Bay Low Flow Diversion Upgrades Pkg. 3 Phase II
  • Santa Monica Bay Low Flow Diversion Upgrades Pkg. 4
  • South Los Angeles Wetlands Park
  • Strathern Pit Multiuse – Land Acquisition*
  • Taylor Yard River Park-Parcel G2 Land Acquisition*
  • Temescal Canyon Park Stormwater BMP Phase I
  • Westminster Dog Park Stormwater BMP
  • Westside Park Rainwater Irrigation
  • Machado Lake Phase I (Wilmington Drain) HRMMP
PROJECTS CANCELED
  • Cabrito Paseo Walkway/Bike Path (CANCELED)
  • La Cienega/Fairfax Stormwater BMP (CANCELED)
  • Westchester Stormwater BMP (RENAMED ARGO)
*Schedule not controlled by Prop O
**Non Prop O Funded

 

PROJECTS COMPLETED

Westwood Greenway Photo 2022
Westwood Greenway Photo 2022
Westwood Neighborhood Greenway
albion dairy park
albion dairy park
Albion Dairy Park Land Acquisition
catch basin 1
catch basin 1
Catch Basin Inserts and Screen Covers
cesar chavez
cesar chavez
Cesar Chavez Ground Water Improvement
Elmer slider photo
Elmer slider photo
Elmer Avenue Phase II: Elmer Paseo
glenoaks
glenoaks
Glenoaks-Sunland Stormwater Capture
grand boulevard
grand boulevard
Grand Boulevard Tree Wells
hansen dam
hansen dam
Hansen Dam Wetlands Restoration
imperial highway
imperial highway
Imperial Highway Sunken Median