Loading...
Skip to content

Document Library

 
Select AllClear
categoryName
Select AllClear
typeName
2018 Biodiversity Report - Appendix B
(7.3 MB)
2018 Biodiversity Report - Appendix B provides additional information regarding the methods used to calculate each of the 23 indicators included in the Singapore Index for the City of Los Angeles.
2018 Biodiversity Report - Appendix A
(7.0 MB)
2018 Biodiversity Report - Appendix A includes supporting information, links, and references integral to the 2018 Biodiversity Report.
recycLA Star Program
(737.8 KB)
Los Angeles Biodiversity Report 2018
(39.6 MB)
Measurement of the Singapore Index of Cities' Biodiversity and Recommendations for a Customized Los Angeles Index
Quarterly Payment 4-12-18
(63.1 KB)
Final EIR Appendices - Ballona Creek Bacteria TMDL Project
(22.6 MB)
Final EIR Appendices - Ballona Creek Bacteria TMDL Project
Final EIR - Ballona Creek Bacteria TMDL Project
(15.5 MB)
Final EIR - Ballona Creek Bacteria TMDL Project
Construction Notification - Shaft 2 - 4.5.2018
(446.2 KB)
This document contains construction information for the Venice Dual Force Mail project - Shaft 2 - for April 7, 2018.
18-19 Permit Renewal Letter
(284.3 KB)
18-19 Waste Hauler Permit Application
(218.8 KB)
TOS SN-101 Honeywell Distributed Control System Services Support
(98.4 KB)
040218 Management Assistant Bulletin
(105.4 KB)
The City of Los Angeles is accepting applications for Management Assistant through April 5, 2018. This document contains information about the position requirements, including how to apply.
Construction Notification - Shaft 6 - 3.29.2018
(412.3 KB)
Construction of a new 54-inch diameter force main sewer line to operate as a parallel system in conjunction with the existing sewer line. The project will increase capacity, create pipeline redundancy and allow for maintenance. This document contains a work schedule.
Construction Notification - Shaft 2 - 3.29.2018
(445.6 KB)
Construction of a new 54-inch diameter force main sewer line to operate as a parallel system in conjunction with the existing sewer line. The project will increase capacity, create pipeline redundancy and allow for maintenance. This document contains a work schedule.
April-May 2018 Construction Notification Shaft 4
(414.8 KB)
Construction of a new 54-inch diameter force main sewer line to operate as a parallel system in conjunction with the existing sewer line. The project will increase capacity, create pipeline redundancy and allow for maintenance. This is the work schedule for April and May 2018.
Bonded Sewer Contractors approved by City of LA
(433.1 KB)
This document is a list of bonded sewer contractors, provided by the City's Bureau of Engineering. Other sewer contractors can become approved by the Board of Public Works upon meeting the Board Requirements.
March 2018 Construction Notification Shaft 11
(385.5 KB)
Construction of a new 54-inch diameter force main sewer line to operate as a parallel system in conjunction with the existing sewer line. The project will increase capacity, create pipeline redundancy and allow for maintenance. This is the Saturday work schedule for 3/24/18, 3/31/18, and 4/7/18
SITES - paid 6-week internship
(479.3 KB)
CEQA Mitigated Negative Declaration
(514.4 KB)
Lopez Canyon Equestrian Trails
Appendix E Response to Comments
(5.7 MB)
Lopez Canyon Equestrian Trails