Loading...
Skip to main content

Document Library

 
Select AllClear
categoryName
Select AllClear
typeName
DSC Continuity of Operation Plan 11-18-20
(219.8 KB)
DSC Continuity of Operation Plan Revised November 18, 2020
Los Angeles 2020 Biodiversity Report
(300.0 MB)
Los Angeles 2020 Biodiversity Report Appendix A
(30.2 MB)
Los Angeles 2020 Biodiversity Report Appendix C
(26.4 MB)
Los Angeles 2020 Biodiversity Report Appendix B Pt 1
(551.5 MB)
PGL Resume Action Verbs
(34.2 KB)
Handout for LASAN's annual Engineer Day event held Saturday, November 14, 2020
2019-2020 LASAN Environmental Engineering Associate Job Bulletin
(154.5 KB)
Handout for LASAN's annual Engineer Day event held Saturday, November 14, 2020
2019-2020 LASAN Engineering Positions
(2.0 MB)
Handout for LASAN's annual Engineer Day event held Saturday, November 14, 2020
Biosolids Fact Sheet - Handling 2018
(2.4 MB)
Handout for LASAN's annual Engineer Day event held Saturday, November 14, 2020
Biosolids Fact Sheet - Production 2018
(2.2 MB)
Handout for LASAN's annual Engineer Day event held Saturday, November 14, 2020
Biosolids Fact Sheet - Monitoring 2018
(1.8 MB)
Handout for LASAN's annual Engineer Day event held Saturday, November 14, 2020
Biosolids Fact Sheet - Management 2018
(1.0 MB)
Handout for LASAN's annual Engineer Day event held Saturday, November 14, 2020
LASAN Engineer Day 2020 Presentation Deck
(10.8 MB)
Presentation for LASAN's annual Engineer Day event held Saturday, November 14, 2020
Los Angeles 2020 Biodiversity Report Appendix B Pt 4
(631.9 MB)
Los Angeles 2020 Biodiversity Report Appendix B Pt 2
(621.8 MB)
Los Angeles 2020 Biodiversity Report Appendix B Pt 3
(506.1 MB)
2020 Biodiversity Symposium Presentation
(6.8 MB)
Biodiversity 2020 Ecotopes Presentation - Isaac Brown
(81.2 MB)
DSC Continuity of Operation Plan
(206.0 KB)
DSC Continuity of Operation Plan
WCIP 10-Year Expenditure Plan 2020-21
(3.2 MB)
The Clean Water Capital Improvement Program (CWCIP) includes capital projects developed for the City's Clean Water facilities. The projects included in this document have been approved by the City's Program Review Committee, comprised of Assistant Directors of LA Sanitation (LASAN) and a Deputy City Engineer. The administration, coordination, and implementation of the projects in the 10-Year WCIP are assigned to various divisions of LASAN and the Bureau of Engineering (BOE) in the Department of Public Works. The Program includes replacement, rehabilitation and expansion of the City's clean water treatment and collection system facilities.