LA SEWERS


CITY OF LOS ANGELES
DEPARTMENT OF PUBLIC WORKS

Search
Advanced
ABOUT THE CITY'S SEWER SYSTEM
CURRENT SEWER CONSTRUCTION PROJECTS
FUTURE SEWER CONSTRUCTION PROJECTS
Upper Beachwood East Maintenance Hole Addition Project
The Secondary Sewer Renewal Program (SSRP)
LATERAL ROOT NOTIFICATION PROGRAM
FATS, OIL AND GREASE PROGRAM
SPILLS & BACKWATER VALVES
ODORS


City Sewers Future Construction

The Secondary Sewer Renewal Program (SSRP)

In October 2004, the City of Los Angeles Department of Public Works reached a settlement agreement with various governmental and environmental agencies to rehabilitate and replace old, damaged and substandard sewer pipes throughout the city over the next 10 years. These sewer pipes are small – less than 16 inches in diameter – but are important because they connect to residents’ and businesses’ private sewers.

They convey flows to larger pipes that carry wastewater to the Hyperion Treatment Plant in Playa del Rey where it is treated to a high quality before being released into the Santa Monica Bay. Rehabilitation of the faulty sewer pipes will improve sewer flows, reduce maintenance and potential sewer spills, and help minimize sewer odors.

 Here are some secondary sewers that will be built in the near future:

 


Caesar Chavez Avenue and Alameda Street Sewer Project
This sewer pipe rehabilitation project will begin in early 2011 in the Silver Lake and Echo Park areas.  PROJECT PAGE


Camden Avenue and Exposition Blvd Sewer Project
This sewer pipe rehabilitation project will begin in spring 2010 in West Los Angeles.  PROJECT PAGE


Eagle Rock Boulevard and York Boulevard Sewer Project
This sewer pipe rehabilitation project will begin in spring 2010 in northeast Los Angeles.  PROJECT PAGE


Franklin Avenue and Hyperion Avenue Sewer Project
This sewer pipe rehabilitation project will begin in early 2010 in Hollywood  PROJECT PAGE.


Fresno Street and Oregon Street Sewer Replacement Project
This sewer pipe rehabilitation project will begin in spring 2010 in East Los Angeles.  PROJECT PAGE


Griffith Park Boulevard and Glendale Boulevard Sewer Project
This sewer pipe rehabilitation project will begin in early 2010 in Hollywood and the Silver Lake – Echo Park areas.  PROJECT PAGE


Los Feliz Boulevard and Riverside Drive Sewer Project
This sewer pipe rehabilitation project will begin in early 2010 in Hollywood.  PROJECT PAGE


Pasadena Freeway and Marmion Way Sewer Project
This sewer pipe rehabilitation project will begin in spring 2010 in northeast Los Angeles.  PROJECT PAGE


Robertson Boulevard and Alcott Street Sewer Project
This sewer pipe rehabilitation project will begin in fall 2010 in West Los Angeles and the Wilshire District.  PROJECT PAGE


Rodeo Road and Norton Avenue Sewer Project
This sewer pipe rehabilitation project will begin in fall 2009 in West Los Angeles and the Wilshire District.  PROJECT PAGE


Sunset Boulevard and Glen Rising Drive Sewer Project
This sewer pipe rehabilitation project will begin in spring 2010 in Hollywood.  PROJECT PAGE


Ventura Boulevard and Lankersham Boulevard Sewer Project
This sewer pipe rehabilitation project will begin in spring 2010 in the south San Fernando Valley and central Los Angeles areas.  PROJECT PAGE

CONTACT  AND  INFORMATION
Report Sewer ODORS
Report Sewer SPILLS   Or CALL 3-1-1, or (213) 473-3231
More information: (213) 978-0333,
or email bpw.pao@lacity.org
City of Los AngelesDepartment of Public Works
Copyright and Disclaimer
 BUREAU OF SANITATION
 BUREAU OF ENGINEERING
 CONTRACT ADMINISTRATION