LA SEWERS


CITY OF LOS ANGELES
DEPARTMENT OF PUBLIC WORKS

Search
Advanced
ABOUT THE CITY'S SEWER SYSTEM
CURRENT SEWER CONSTRUCTION PROJECTS
Air Treatment Facility - Jefferson Blvd.
  Air Treatment Facility - La Cienega and Jefferson
  Alvarado Crandall Relief Sewer
  Avenue 45 – Arroyo Drive Relief Sewer
  Central Outfall Sewer Rehabilitation Project
  La Cienega Interceptor Relocation Project: Rodeo to Jefferson
  Lower North Outfall Sewer Rehabilitation Project –Phase 2
MAZE 5 Sewer Rehabilitation Project
  Upper Beachwood Central Maintenance Hole Addition Project
  Upper Beachwood East Maintenance Hole Addition Project
  Washington Boulevard - Oxford Avenue - Beach Avenue Relief Sewer Project
The Secondary Sewer Renewal Program (SSRP)
FUTURE SEWER CONSTRUCTION PROJECTS
LATERAL ROOT NOTIFICATION PROGRAM
FATS, OIL AND GREASE PROGRAM
SPILLS
ODORS

 
Project Information from the Bureau of Engineering

City Sewers Current Construction

Upper Beachwood Central Maintenance Hole Addition Project

This project is now underway in the Hollywood Hills. The approximate project boundaries are Rodgerton Drive on the north, Ledgewood Drive on the west, Beachwood Drive on the east, and Belden Drive on the south.


QUICK FACTS

  • These sewers contain many sharp bends, and do not have adequate maintenance holes for access and repair. This project will provide the much needed maintenance holes to allow proper sewer service and reduce the possibility of spills and odors.
  • Thirty-five shallow maintenance holes and approximately 500 linear feet of 8-inch sewers will be constructed.
  • late 2008 through late 2009. Weather or other circumstances could shift the work schedule. Residents will be informed as conditions warrant.
  • Construction period: late 2008 through late 2009. Weather or other circumstances could shift the work schedule. Residents will be informed as conditions warrant..
  • Estimated Cost: $500,000
  • Construction method will be open cut (trenching). Due to the narrow, winding, hilly streets and congested, shallow, underground utilities, the duration of the work that may take place in front of your property is unknown at this time. Any inconveniences to you will be minimized as much as possible while the work is underway.
  • Trucks and other equipment such as pipes will be used during construction, and you may see open trench excavation and debris removal.
  • Dust control will be provided in all project areas.
  • Enclosures or other barriers will be used in construction areas wherever necessary for public safety. Please do not enter the construction work area.
  • Local access will be allowed. Traffic will be restored to normal when construction has been completed at the end of each workday.
  • Trash pickup, deliveries, access to businesses and residential driveways will be maintained whenever possible; in the event that temporary access is blocked you will be properly notified.
  • Parking will be temporarily restricted in some areas, and signs will be posted in advance telling you where and when.
  • You will be notified 24 to 48 hours in advance whenever sewer service may be temporarily interrupted.

CONTACT  AND  INFORMATION
Report Sewer ODORS
Report Sewer SPILLS   Or CALL 3-1-1, or (213) 473-3231
More information: (213) 978-0333,
or email bpw.pao@lacity.org