Slauson – Van Ness Sewer Project
  Washington Blvd. – Flower St. to Grand Ave. Sewer Project
  Washington Blvd. – Grand Ave – Hill St. Sewer Project
The Secondary Sewer Renewal Program (SSRP)
Rodeo Road – 52nd Street, and La Brea Avenue – Crenshaw Boulevard Sewer Rehabilitation Project
Lincoln Boulevard and Sunset Avenue Sewer Replacement Project
FUTURE SEWER CONSTRUCTION PROJECTS
LATERAL ROOT NOTIFICATION PROGRAM
FATS, OIL AND GREASE PROGRAM
SPILLS & BACKWATER VALVES
ODORS

 
Project Information from the Bureau of Engineering

City Sewers

Completed Construction

Slauson – Van Ness Sewer Project

This project was built to keep sewage moving safely and reliably through the wastewater collection system. The project at Slauson and Van Ness had three main parts.

  1. A new diversion structure (where sewage can be diverted to another sewer) was built under the northwest corner of the intersection at Slauson and Van Ness.
  2. Replacement parts were installed in the existing junction structure (the place where two or more sewers come together) under the intersection.
  3. A short sewer bypass (connecting pipeline) was built across Slauson Avenue. The Slauson – Van Ness project is one of many sewer repair projects being built throughout Los Angeles under the Collection System Settlement Agreement between the City, the U.S. Environmental Protection Agency and the Santa Monica BayKeeper.

QUICK FACTS

  • Work began in early 2006 and continued for about a year.
  • The new, 36-inch diameter sewer pipe was placed under Slauson Avenue. A pit was excavated in Slauson Ave., west of the intersection, in order to build the junction structure.
  • During construction, traffic on Slauson and Van Ness was allowed in all directions, but the number of lanes was reduced. Signs were posted to direct traffic safely through the intersection.
  • Contract amount - $2.86 million.
  • Construction management – City of Los Angeles, Department of Public Works, Bureau of Engineering.
  • Inspection – City of Los Angeles, Department of Public Works, Bureau of Contract Administration.

 

CONTACT  AND  INFORMATION
Report Sewer ODORS
Report Sewer SPILLS   Or CALL 311, or (213) 473-3231
More information: (213) 978-0333,